Streets and squares
Joinery painting on Queen's Gate
Joinery on Queen's Gate is counted in threes. Both of the grade II terraces are three windows wide, with vertical sliding timber sashes. On nos. 1-26, built between 1856-8, the third-floor sashes have arched heads, and the first floor is French casements onto balconies. On nos. 68-87 the sashes sit in reveals with architrave surrounds. Replacement windows in uPVC and aluminium are already noted as a harm. This page is about the timber that is still there.
Arched heads are a different sash from the floors below
On the Richardson houses the third floor changes shape. The head is arched. A brush specification written for a rectangular Georgian sash will leave the curve thick and the spandrels starved. We schedule that floor on its own line: arched head, meeting rail, and the way the sash sits in the stucco opening. The floors below are rectangular sliding sashes, three across. Cords, pulleys and the staff bead are looked at before paint, because a sash that is painted shut is not a decorated window. It is a window that no longer slides. Where the household needs the sash to move, the meeting surfaces are painted in an order that lets the weight work before the day ends. Putty is renewed only where it has left the rebate. Bare timber in that rebate is primed. We do not rake out sound putty for the look of a fresh line.
French casements and the balcony they open onto
The first floor of nos. 1-26 is not a sash. It is a French casement opening onto a balcony enclosed with bottle balustrades. Casements have hanging stiles, espagnolette or surface bolts, and a threshold that takes weather. They are painted so they still open. The bottle balustrade is masonry or cast detail, not the casement's timber system, and it is a separate line if you want it in the same visit. A decorator who sprays the casement and the bottles together will bridge both the glazing bars, if any remain, and the waists of the bottles. We keep the two trades apart even when they share a morning. Ironmongery is masked. Paint on a bolt is the usual reason a casement will not fasten, and on a street of flats that is not a small annoyance.
Architraves on the later terrace
Nos. 68-87, twenty houses from 1866-87, set the sashes in reveals with architrave surrounds. The architrave is the moulding that makes the window read against rusticated stucco and, higher up, against the plain stucco field. It is easy to flood. The internal angle holds old paint in a ridge. We knife the loose ridge out and finish with a small brush so the profile survives. Losing that profile is exactly the sort of detail loss the draft says can spoil the proportions of a group. The reveal itself, the side of the opening, is often forgotten in a 'windows' line. It is in our schedule when the architrave is in, because a fresh architrave against a dirty reveal looks like the work stopped at the easy face.
uPVC and aluminium stay outside the specification
The draft records replacement windows in modern designs and materials such as uPVC and aluminium, put in with little regard to the original joinery. We will not paint those frames as if they were the timber sash they replaced, and we will not quote a timber repair for a plastic unit. If a house has two timber sashes and one replacement, the quotation says so. The harm is already described. Painting the plastic to look like the neighbour does not undo it, and it can make the mismatch more obvious. Where you are considering a future return to timber, that is a joinery and consent question, not a coat of paint. We will coat the timber that remains and leave a clear edge against the unit we are not touching.
Old paint on repeatedly coated sashes
Lead pigments were widely used in household paint until the 1960s. Sliding sashes on a street developed between 1855 and 1870 are the sort of repeatedly painted timber that advice is about. Sound old paint is left. Only flaking, chipping or dusting material is taken off. Dry sanding along a run of staff beads is avoided, because dry sanding old paint is among the jobs that put people most at risk from lead dust. We do not overheat leaded paint with a blow lamp or a gas torch. The finish is a coating on a clean, keyed, sound film. It is not a sash stripped to bare wood so that the moulding looks new. Dust that is made is kept off the sill and out of the area. Floors inside, if the sash is painted from the room, are covered before any knife starts.
Sources: HSE, Construction hazardous substances: Lead; HSE, Old lead paint: what you need to know as a busy builder (CIS79)
What the joinery list on this street contains
Three openings per floor, with the arched third floor and the French casement called out when the number is in 1-26, and the architrave called out when the number is in 68-87. A house outside those two terraces is not given either description until we have looked at it. Balcony bottles, porticos and cornices are exterior masonry and stay off this page unless you have asked for one visit to do both. No prices and no durations are stated. The written quotation after the visit is the list, and it says which leaves must still open.
Questions about Joinery painting on Queen's Gate
Which windows have arched heads?
On nos. 1-26 the third-floor sashes have arched heads. The houses are three windows wide, with vertical sliding timber sashes. The first floor of those houses is French casements, not sashes.
What surrounds the windows on nos. 68-87?
Vertical sliding timber sashes set in reveals with architrave surrounds. The architrave is part of the painted joinery, and keeping its profile is part of the work.
Will you paint uPVC windows to match the timber ones?
No. The draft already treats uPVC and aluminium replacements as harmful to the original joinery. We coat the timber that remains and leave the plastic unit out of the specification.
Pages to read with this one
Adjoining streets and wider work
Tall stucco terraces of this kind are also described by Kensington painters and decorators.
Where a sash needs joinery repair as well as paint, that wider work sits with Hampstead Renovations.
A South Kensington enquiry
What would you
like to change?
Start with the property address and the part of your home that needs decoration. Tell us what is there now and what you would like the work to achieve.
Your decorating enquiry
Outline the rooms, existing finishes and arrangements for access.